FEC were engaged to design, supply and provide installation/removal services for three temporary masts in various locations for events in WA. These …

Midland

Midland

Jan 20, 2017

FEC were engaged to design, supply and install a 21m Rooftop Guyed Mast above a workshop roof in Midland, WA.

Client: ATI Australia
Year: …

Mt Yarrabah

Mt Yarrabah

Oct 3, 2016

Design, supply and installation of a 26m Guyed Mast at Mt Yarrabah near Cairns. The existing mast was due for replacement and was removed by FEC …

Blackstone

Blackstone

Sep 14, 2016

FEC recently completed the construction of a 275kV powerline in QLD to facilitate the establishment of Powerlink’s 275kV Blackstone substation. …

Torres Strait

Torres Strait

Aug 15, 2016

Design, supply and deliver 6 Guyed Masts; ranging from 25m to 65m in height to replace existing structures The masts were fabricated in our factory …

Molloy Island

Molloy Island

Jul 12, 2016

Installation of a 40m Tower to enable wireless NBN connection at Augusta, WA. Due to the tower location on the island there was no access for …

Tierawoomba

Tierawoomba

May 31, 2016

Design, supply and installation of tower and foundation strengthening for 31.5m Square Angle Tower to enable additional loading to be installed. …

Cosmo

Cosmo

May 25, 2016

Design, supply and installation a 90m Guyed Mast that was required to provide a critical communications link for our customer. The project also …

Mt Stuart

Mt Stuart

May 19, 2016

Design, supply and installation of a 60m Guyed Mast at Mt Stuart in Townsville. The existing mast was heavily degraded and was removed by FEC prior …

Busselton & Capel

Busselton & Capel

May 11, 2016

Design, supply and installation of 2 x 40m monopoles in Busselton and Capel located in WA’s southwest. The poles were required to support a …

DeGrussa Copper Mine Site

DeGrussa Copper Mine Site

May 9, 2016

Design, supply and installation of an 11kV powerline to provide a permanent power solution for our customer’s infrastructure. The project also …

Ballera

Ballera

Jul 15, 2015

Design, supply and installation of 90m communications tower. The construction was captured on a time lapse camera which can be viewed …

Eastern Ridges

Eastern Ridges

May 28, 2014

Design, supply and installation of 4 x 40m communications towers. The contract also included installation of the site compounds including equipment …

Hope Downs

Hope Downs

Jan 17, 2013

Design, supply, installation, testing and commissioning 35km of 33kV overhead powerline, 20km of underground cable and fibre optic cables for the …

Mumbida Wind Farm

Mumbida Wind Farm

Oct 17, 2012

Supply and installation of 6km 132kV dual circuit overhead powerline for new wind farm.
Future was also awarded a separate contract for the design, …

90m Tower – Newman

90m Tower – Newman

Aug 24, 2012

Design, supply and installation of 90m communications tower to replace ageing infrastructure. Contract also included supply, installation, testing …

Optus Towers

Optus Towers

Jan 17, 2012

Design and supply 120 x self supporting towers, monopoles and guyed masts.

Client: Optus
Project Timeframe: 2009 – current
Location: Various …